Roadmap
Development roadmap
This is the plan we operate against, not a pitch graphic. Phases are sequential because the work is: each one produces the evidence the next one needs. Dates are targets, and we update them when reality disagrees.
01
In progressResearch
2025 — 2026
Build depth in the core domains: multi-agent coordination on ROS 2, VTOL flight systems, and geospatial intelligence. Output is prototypes, test data, and public engineering notes.
Milestones — working set
- Multi-agent ROS 2 communication stack running in containerised simulation
- VTOL testbed airframe assembled and instrumented
- GeoAI pipeline processing real spatial data
- Public engineering log established
02
PlannedPrototype
2026
Integrate the research threads into one flying system: autonomous VTOL flights with onboard perception, logged and analysed.
Milestones
- First autonomous VTOL transition flight
- Onboard compute running perception in flight
- Repeatable autonomous survey pattern
- Failure-mode catalogue from flight logs
03
PlannedMVP
2026 — 2027
One platform, one mission, done reliably: autonomous mapping/survey flights that a non-engineer could commission and understand the output of.
Milestones
- End-to-end mission autonomy (plan, fly, land, deliver map)
- Ground-station software usable by a trained operator
- Reliability data across 50+ missions
- Regulatory groundwork for pilot operations in India
04
PlannedPilot deployment
2027
Field pilots with real partners — infrastructure inspection, terrain mapping, or public-sector response — under real conditions, with published results.
Milestones
- Two or more pilot partners signed
- Multi-vehicle coordinated missions in the field
- Pilot case studies published
- First revenue
05
PlannedCommercial launch
2027
Turn what pilots proved into a product: hardware, autonomy stack, and fleet software offered commercially in initial verticals.
Milestones
- Production-ready platform revision
- Commercial offering and pricing
- Certification and compliance complete for target markets
- Founding team grown into an engineering org
06
PlannedScaling
2028+
Scale manufacturing, fleet operations, and the team. Extend the autonomy core beyond the first platform class.
Milestones
- Serial production capability
- Fleet operations infrastructure
- Second platform class in development
07
PlannedGlobal expansion
2029+
Take the stack to international markets and broader domains — the long-term goal is a full-stack autonomy company serving fleets across air and ground.
Milestones
- International market entry
- Cross-domain platform family
- Long-term R&D lab established